Non EMC Rack-Ready Cabinets !

Systems are not rack-ready , it is recommended an order to allow the hot addition for expansion shelves in future. As below:

In steps 1, 2, 3, and 4 in the example, establish the first expansion shelf at the bottom of each shelf set based on the system capacity, positioning them in the rack according the diagram shipped with the specific system. This establishes the full range of space in the racks required for future expansion of capacity as needs require.

It also allows for easy installation of additional shelves into any shelf set, with a simple process of installing the shelf and re-cabling so that the B side cable from the controller is connected to the host port on the new shelf at the end of the chain. Interconnect cables are also added between the two shelves.

 

Advertisements

About Ahmad Sabry ElGendi

https://www.linkedin.com/pub/ahmad-elgendi/94/223/559
This entry was posted in Data Domain, E20-385, EMC. Bookmark the permalink.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s